Ceritified
SINCE 2002
The Best
RENEWABLE ENERGY
Number #1
PROJECT MANAGEMENT
+233 593 884 759

Blog 4 Columns With Frame

Caption align here

Construction of 161/34.5kv Kintampo Bulk Supply Point

Supply and Installation of two (2No.) 161/34.5kV,25/33MVA Power Transformers, two (2No) 250kVA,34/0.415kV Auxiliary transformer, balance of plant in a breaker-and-half bus bar...
Continue Reading

Construction of Sunyani Bulk Supply Point

Supply and Installation of Gantries, Busbars, PTs, Live Tank Circuit Breakers, CCVTs, disconnects for the construction to Expand the 161kV Substation. Gantries...
Continue Reading

Upgrade of Mim Substation to Bulk Supply Point

Design, Supply and Installation of 1No. 161/34.5kV,25/33MVA Power Transformer and 1No. 34.5/0.433-0.25kV, 250kVA Grounding/Auxiliary Transformer and relevant balance of plant.
Continue Reading

Possession of my entire soul

A wonderful serenity has taken possession of my entire soul, like these sweet mornings of spring which I enjoy with my whole...
Continue Reading

Pityful a rethoric question ran

A wonderful serenity has taken possession of my entire soul, like these sweet mornings of spring which I enjoy with my whole...
Continue Reading

Separated they live in Bookmarksgrove

Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Vestibulum id ligula porta felis euismod semper. Nullam quis risus...
Continue Reading