JobSupply and Construction
DescriptionOverhead Transmission line
Location

Project Description

Supply and Construction of 161 kV Overhead Transmission line 1. construction of 3km double Circuit, 161kV Transmission Line between the using double circuit twin – bundle TERN conductors on conventional steel lattice AA, BB and CC towers fitted with two shield wires and using the existing Right of Way (ROW). 2. Decommissioning of Angle/ Section Towers/foundations, Transporting Tower members to Warehouse. 3. Decommissioning/Restringing of conductors