Ceritified
SINCE 2002
The Best
RENEWABLE ENERGY
Number #1
PROJECT MANAGEMENT
+233 593 884 759

Blog Full Both Sidebar With Frame

Caption align here
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Continue Reading
Supply and Installation of two (2No.) 161/34.5kV,25/33MVA Power Transformers, two (2No) 250kVA,34/0.415kV Auxiliary transformer, balance of plant in a breaker-and-half bus bar configuration, Relocation of one CKT 161kV Transmission Line involving the construction of two dead towers, stringing of one CKT of ACSR TERN conductors...
Continue Reading
Supply and Installation of Gantries, Busbars, PTs, Live Tank Circuit Breakers, CCVTs, disconnects for the construction to Expand the 161kV Substation. Gantries and bus work for the provision of a line bay to be equipped with 161kV line terminal equipment for Berekum
Continue Reading
Design, Supply and Installation of 1No. 161/34.5kV,25/33MVA Power Transformer and 1No. 34.5/0.433-0.25kV, 250kVA Grounding/Auxiliary Transformer and relevant balance of plant.
Continue Reading
A wonderful serenity has taken possession of my entire soul, like these sweet mornings of spring which I enjoy with my whole heart. I am alone, and feel the charm of existence in this spot, which was created for the bliss of souls like mine....
Continue Reading
1 2 3

About Us

Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Donec sed odio dui.

Text Widget

Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Donec sed odio dui. Etiam porta sem malesuada.