Ceritified
SINCE 2002
The Best
RENEWABLE ENERGY
Number #1
PROJECT MANAGEMENT
+233 593 884 759

Tag

Metal
Supply and Installation of two (2No.) 161/34.5kV,25/33MVA Power Transformers, two (2No) 250kVA,34/0.415kV Auxiliary transformer, balance of plant in a breaker-and-half bus bar configuration, Relocation of one CKT 161kV Transmission Line involving the construction of two dead towers, stringing of one CKT of ACSR TERN conductors and OPGW and decommissioning of existing tower.
Continue Reading
Supply and Installation of Gantries, Busbars, PTs, Live Tank Circuit Breakers, CCVTs, disconnects for the construction to Expand the 161kV Substation. Gantries and bus work for the provision of a line bay to be equipped with 161kV line terminal equipment for Berekum
Continue Reading
Design, Supply and Installation of 1No. 161/34.5kV,25/33MVA Power Transformer and 1No. 34.5/0.433-0.25kV, 250kVA Grounding/Auxiliary Transformer and relevant balance of plant.
Continue Reading
Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast of the Semantics, a large language ocean. A small river named Duden flows by their place and supplies it with the necessary regelialia. It is a paradisematic...
Continue Reading

The quick, brown fox jumps over a lazy dog. DJs flock by when MTV ax quiz prog. Junk MTV quiz graced by fox whelps. Bawds jog, flick quartz, vex nymphs. Waltz, bad nymph, for quick jigs vex! Fox nymphs grab quick-jived waltz. Brick quiz whangs jumpy veldt fox. Bright vixens jump; dozy fowl quack.

Oga Mandino

Text Widget

Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Nulla vitae elit libero, a pharetra augue. Donec sed odio dui. Etiam porta sem malesuada.

Recent Works