Ceritified
SINCE 2002
The Best
RENEWABLE ENERGY
Number #1
PROJECT MANAGEMENT
+233 593 884 759

Portfolio 4 Columns No Space

Full Width, With Excerpt, No Space

Stringing of Optical Ground Wire

/
Loading, transportation, unloading, delivery at site, installation, splicing, termination, testing, remedying of defects, demonstration of acceptance, commissioning and documentation of […]

Self Help Electrification 4 – Phase 4

/
Construction of 2,163 km of 33kV overhead Transmission Line, Construction of 1,988 km of LV overhead distribution line, installation of […]

USTDA South Mini Grid

/
Low voltage network distribution plan design and drawings. Data collection

Self Help Electrification 4 – Phase 3

/
Construction of 1,128 km of 33kV overhead Transmission Line, Construction of 1,288 km of LV overhead distribution line, installation of […]

Self Help Electrification 4 – Phase 2

/
Construction of 1,693 km of 33kV overhead Transmission Line, Construction of 1,933.65 km of LV overhead distribution line, installation of […]

Bunkpa Off-Grid Biomass Project

/
Design, Supply and Construction of 40kVA (32kW) Off-Grid Biomass Pilot Project at Bunkpa, East Gonja District, Savanna Region, Ghana.

Sunyani Bulk Supply Point

/
Supply and Installation of Gantries, Busbars, PTs, Live Tank Circuit Breakers, CCVTs, disconnects for the construction to Expand the 161kV […]

Bridge Power Project

/
Supply and Construction of 161kV Overhead Transmission line 1. Construction of 3km double Circuit, 161kV Transmission Line between the using […]