Stringing of Optical Ground Wire

/
Loading, transportation, unloading, delivery at site, installation, splicing, termination, testing, remedying of defects, demonstration of acceptance, commissioning and documentation of OPGW cable on 161kV Transmission Lines together with all associated hardware and accessories required to replace existing OPGW or shield wire of various lots

USTDA South Mini Grid

/
Low voltage network distribution plan design and drawings. Data collection

Bridge Power Project

/
Supply and Construction of 161kV Overhead Transmission line 1. Construction of 3km double Circuit, 161kV Transmission Line between the using double circuit twin – bundle TERN conductors on conventional steel lattice AA, BB and CC towers fitted with two shield wires and using the existing Right of Way (ROW). 2. Decommissioning of Angle/ Section Towers/foundations, […]